CAMP PONTIAC – PONTIAC PALACE, COPAKE, NEW YORK

THE CHALLENGE
To design and construct a multi-purpose facility for a summer camp site in upstate New York. The officials at Camp Pontiac desired to provide site work and served as GC for the project. The wooded setting and location of the camp posed site challenges, as did the fast-track schedule. The facility had to be constructed during the camp's off-season – ground-breaking took place during the winter – and needed to be ready for occupancy by campers by summer.

THE SOLUTION
A multi-purpose facility was designed and built by ICA. The pre-engineered steel structure measured 75 feet by 175 feet with 18-foot sidewalls and a 31-foot ridge. ICA provided design drawings, specifications, and interior finishes. The camp provided concrete, electrical and carpentry work, which resulted in significant financial savings. The highly efficient Energy Miser® insulated ceiling and wall system was installed to help keep ongoing operational costs manageable. The facility features two retractable basketball goals, six stationary goals, two complete volleyball standards, and deck hockey boards.

THE RESULT
The project, completed in mid-May, was up and running in time for summer campers to partake of all the new facility had to offer. The camp now offers basketball, volleyball, recreational and social activities, rain or shine, and meets all ADA requirements and life safety codes.

Facility Features
  • $1 million
  • 13,125-square-foot multi-purpose facility
  • Basketball court
  • In-line hockey rink
  • Trophy room
  • Poured concrete foundation
  • Metal standing seam roof
  • Poured concrete with Latexite coating
  • Energy Miser insulation with GymGuard facing
  • TurboCaindle® indirect